Glove manufacturing for brands
Since 2016 · Europe & North AmericaTell us about your project

Evaluate a glove manufacturer before sampling.

Connect the contracting company, factory operations, sample scope and inspection approach so your buying team can make a useful supplier decision.

Editorial still life connecting a miniature sewing machine, yarn, knit gloves and an unmarked supplier folder
Connect supplier identity with the proposed order
For your buying team

Evaluate a glove manufacturer by connecting the contracting company with the factory, matching its operations to your glove, and checking whether its sample proposal and quotation resolve your actual buying requirements. For VORLAN, HANGZHOU FORTHRIGHT TRADE CO.,LTD contracts with buyers and produces through its own factory in Hangzhou.

01

Connect the business name with the factory

Before opening a sample project, establish who will quote, sign the order and manufacture the gloves. A brand name on a website may differ from the contracting company name; ask how the two relate. For VORLAN, the relationship is straightforward: VORLAN is the glove business brand of HANGZHOU FORTHRIGHT TRADE CO.,LTD. This company contracts with buyers and produces through its own factory in Hangzhou, China. Use that legal entity when preparing your supplier file and checking the quotation.

02

Review the operations your glove actually needs

Match the factory discussion to your construction. A knit glove raises questions about yarn, knitting and cuff finishing; a leather style requires attention to panels, sewing, lining and surface finish. Ask which operations are carried out in-house and who coordinates the approved reference between them. VORLAN completes knitting, cutting, sewing, finishing, inspection and packing in its own factory, together with embroidery, printing and leather debossing. A particular style uses the operations required by its agreed construction, rather than every process shown on the website.

A focused supplier discussion
Review areaClarifyUseful outcome
Business identityBrand, contracting company and factory relationshipA supplier record that matches the quotation
Manufacturing fitThe operations needed for your specific gloveA relevant route for the proposed sample
Sample scopeConstruction, material, fee, shipping and start dateOne agreed development brief
AcceptanceMeasurements, workmanship, full inspection and any separate testingA clear basis for sample and order review
03

Use photographs to frame specific questions

Factory photographs help you identify the workshop, equipment and types of work to discuss. Turn that visual context into a question about your proposed order: how will this cuff be finished, how will the label be applied, or how will different sizes be kept identifiable? If your supplier approval requires current facility information or a particular document, request it for that review. Photographs support the conversation; a complete sample and agreed specification establish the product you intend to buy.

04

Define what the sample fee covers before starting

VORLAN’s sample fee is US$80–100 including shipping. Confirm the selected construction, requested material, branding detail and exact sample scope with our team before work starts. Sampling takes 7–10 working days from the agreed start; this development time is separate from transport. Give the destination and required arrival window so the plan can reflect both. Avoid treating the sample shipping inclusion as the delivery basis for a bulk order, which is agreed in its own quotation.

Leather glove pair arranged with a sample pouch, shipping box, material swatch and blank review card
Define the sample construction and review scope before agreeing the sample shipment.
05

Ask what full inspection means for your order

Our factory inspects every finished pair, including dimensions. Nonconforming goods are isolated, reworked and reinspected. Make that process useful for your buying team by agreeing the measurement method, target dimensions, tolerances, workmanship and packing requirements for the actual style. Specialist or laboratory testing has its own scope and must be discussed for the relevant material or product. Full inspection explains the production checks; it does not create a temperature rating, universal touchscreen claim or blanket certification.

06

Look for a useful reply, not just a quoted number

A useful first exchange identifies the proposed construction, the points our factory needs to clarify and the basis on which a sample can be prepared. Ask the quotation to connect the materials, quantity by style and color, branding and packing to the same reference. If two suppliers offer different specifications, settle those differences before comparing totals. Keep payment and sample-revision arrangements with the project quotation; the first website conversation can stay focused on whether the product and manufacturing scope fit.

A useful reply makes the proposed product and next action identifiable. Compare the response with your buying brief, then follow up on the information still needed to choose a sample or request a comparable quotation.

Read the factory reply for decisions, not just promises
Reply receivedStill missingUseful follow-up
“We can make any glove”The route for your selected knit, leather, fleece or layered construction.Ask which operations and material decisions apply to your reference.
“Send a logo and we will quote”The product specification behind the branded version.Confirm construction, component materials, quantities and packing before comparing prices.
“We check quality”The checking scope and acceptance reference.Ask about dimensions, workmanship, nonconforming goods and any separate test requirements.
“Sample takes a week”The start condition, sample scope and transport allowance.Confirm the material decisions, required approvals and expected dispatch separately from arrival.
  1. 01

    Use one representative style to test the conversation

    Send a defined reference such as a leather glove with a snap cuff and explain the change you need. The reply should address that closure and its fit, not simply repeat a general factory introduction. This makes the first sample request easier to scope.

  2. 02

    Keep supplier selection separate from product release

    A confirmed company relationship does not approve the glove. Retain the sample, material references, size specification and artwork for the actual order. If your supplier onboarding requires additional documentation, identify that requirement before setting the production calendar.

07

Separate a supplier decision from production approval

Choosing a factory is the start of development. Before bulk production, approve the actual glove, measurements, material references, artwork and assortment. VORLAN’s minimum is 300 pairs per style per color, and bulk production takes 30–45 working days from the agreed start. Confirm the calendar against the final scope, allowing for approvals and transport. A clear supplier relationship helps the project move forward, while the sample and specification provide the reference for the goods being made.

08

Send a short, answerable first message

You do not need to complete a technical file before contacting us. Send the glove type or one reference image, your approximate style and color quantities, destination and target timing. Add the main decision you need help with, such as material selection or a cuff change. Kevin coordinates the initial discussion with our manufacturing team. Include any company or facility questions required by your sourcing process so they can be addressed alongside the product brief, rather than becoming a separate round of unanswered questions.

A closer look

Buyer questions.

Is VORLAN a factory or only a sourcing brand?

VORLAN is the glove business brand of HANGZHOU FORTHRIGHT TRADE CO.,LTD. The company signs contracts and manufactures through its own factory in Hangzhou, China.

What does a development sample cost?

The sample fee is US$80–100 including shipping. Confirm the exact construction and sample scope with our team before starting. No sample quantity or bulk freight inclusion should be inferred from that fee.

Can we contact you before our specification is complete?

Yes. A reference image or sample, estimated quantities, destination and target timing are enough to begin a discussion. Tell us which decisions remain open so we can define the development scope.

Does full inspection include every finished pair?

Yes, including dimensions. Nonconforming goods are isolated, reworked and reinspected. Acceptance criteria and any specialist testing are agreed for the specific product and order.

What needs approval before bulk production?

Approve the physical glove, material references, measurements, artwork and assortment. Confirm the production start and delivery plan against that agreed scope.

Does a factory photograph prove that a specific glove has been approved?

No. A photograph can support a discussion of the facility or operation. The product decision needs its own identifiable sample, specification and agreed review; an unrelated photo does not establish a test result or approved order.

What should a useful first reply from VORLAN clarify?

The team should connect your reference and quantities to a development scope, identify open material or construction decisions and establish what the proposed sample needs to resolve. Commercial details are confirmed for that project rather than inferred from a general page.

Put the guide to work

Sourcing brief

Bring your category, materials, quantities and development questions into one working brief.

Download the TXT template

A project for your brand

Ready to discuss your glove program?

Bring the references you have and flag the decisions you still need to make.

Preparing your project brief…

WhatsApp